Terms of service
Â
GENERAL
i. All prices listed are in Singapore Dollars (SGD), GST is not applicable.
ii. Prices quoted excludes installation & setup of the equipment unless otherwise agreed or the option to include assembly is selected where applicable.
DELIVERY
i. All deliveries will only be up till main door step entrance unless equipment assembly is required onsite.
ii. If delivery location requires stair climbing, additional stair climbing charges shall apply (refer to shipping policy).Â
iii. Site must be clear from obstructions to facilitate use of trolley during delivery.
iv. If delivery/installation date is requested to be changed by buyer for any reason after it have been confirmed, a surcharge of $20 or 5% of the total order amount shall apply, whichever is higher. Similar surcharge applies for failed delivery/installation attempt after confirmation of scheduled date & time.
v. Rescheduling is permitted up to two times. Additional fees will apply for any further changes.
vi. Buyer or a representative is expected to be present onsite during agreed installation timeframe. A grace period of 10mins is given upon arrival. $30 will be chargeable per 15mins block of waiting time.
FLOORING
i. Sub-Floor should be cleaned and free of contaminant by the owner prior to the installation of the flooring.
ii. Surface to receive is assumed to be permanently dry, free from moisture, clean and smooth.
iii. We will not be responsible for the outcome of the installation as a result of uneven & poor floor finishing or if the floor is not level.
(CEILING / WALL
DRILLING and MOUNTING)
i. Drilling work can only be installed on solid wall. We do not warrant the strength of the wall.
ii. We will use equipment to scan the wall
for metal reinforcement, electrical wire etc. However, if driling work hit metal reinforcement or electrical wire, we can only change to the next location in consultation with the buyer.
iii. If to be installed on brick wall or hollow block, its only on best-efforts basis. We did not build the wall thus we cannot guarantee the holding strength of brick wall or hollow block walls. Please note that we are already using industrial wall plug.
iv. If the subject wall is a connecting wall,
please ensure that it has enough thickness (i.e., at least 12cm). We will not be liable if the wall crack-out or pieces fall-off on the other side due to impact of the hammer drill.
v. Please be informed that 'making good'
and painting are not included
vi. No refund of equipment or installation
WARRANTY
All our equipments are covered by a 1 year limited manufacture warranty.